Solar EPC Contracts Before 2019 Taxed at 5%: Supreme Court Rejects the 70:30 Demand and Extended Limitation in Sterling and Wilson

Chandrasekhar Kutty, Founding Partner, Sashthi Taxlegal Advisory Services LLP
Knowledge Hub · Case Law · 25 November 2026

On 16.11.2026, the Supreme Court allowed the appeal of Sterling and Wilson Pvt Ltd and set aside a Section 74 order of the Joint Commissioner, CGST & CX, Thane. The order had confirmed CGST of ₹13.34 crore with matching SGST and an equal penalty, about ₹53.36 crore in all. The Court held that turnkey supply of solar power generating systems between 01.07.2017 and 31.12.2018 was taxable at 5%, that the 70:30 deemed split cannot be applied to that period, and that the extended period of limitation was wholly unsustainable. The judgment is reportable (2026 INSC 1222).

Background

The company supplied and installed solar power generating (SPG) systems under turnkey EPC contracts and paid tax at 5% under Sl. No. 234 of Schedule I to Notification 1/2017-Central Tax (Rate). The Department took the view that the 70:30 split between goods (5%) and services (18%), introduced by Notification 24/2018-Central Tax (Rate) and Entry 38 of Notification 11/2017 (as amended by Notification 27/2018) with effect from 01.01.2019, should be applied to the earlier period as well, relying on Circular 163/19/2021-GST. The Bombay High Court dismissed the writ petition on the ground of alternative remedy. The Supreme Court had stayed the order on 25.08.2025.

What the Supreme Court held

Alternative remedy is not a straitjacket

The rule of exhausting the statutory appeal is not a rigid formula. Dismissing the writ cursorily when arguable points were raised was not justified. Since the issue had already been decided by the Andhra Pradesh High Court and was argued at length, the Supreme Court decided the merits itself instead of sending the matter back.

5% for 01.07.2017 to 31.12.2018

For this period, supply and installation of an SPG system under a turnkey EPC contract was taxable at 5% as an SPG system under Sl. No. 234 of Schedule I to Notification 1/2017-CT(R).

The 70:30 rule is prospective

The 70:30 deemed-value Explanation and Entry 38 apply only from 01.01.2019. They are not retrospective.

Circular 163 gives an option, not a mandate

Circular 163/19/2021-GST dated 06.10.2021 uses the word “can”. It only gives taxpayers an option to adopt 70:30 for the earlier period. The Department misread it as compulsory.

Not a works contract

A works contract under Section 2(119) needs immovable property as the end product. Not every composite supply under Section 2(30) is a works contract. SPG panels and modules fixed to a civil foundation for stability can be detached and used elsewhere, so they are not immovable property. The civil-work components do not by themselves turn the EPC contract into a works contract.

No suppression of a rule that did not exist

Since the 70:30 formula did not exist before 01.01.2019, no fraud, wilful misstatement or suppression could be imputed for not applying it. Invoking Section 74 was wholly unsustainable, following the Court’s earlier decision in Tata Steel.

Later change of entry not retrospective

The substitution of “solar power generating system” by “solar power generator” (Sl. No. 201A, Notification 8/2021-CT(R)) cannot be applied backwards.

What this means for your business

  • Revisit pending solar EPC demands. Any demand that applies 70:30 to supplies between July 2017 and December 2018 is now directly covered by this judgment.
  • Challenge reliance on Circular 163. Where a notice or order treats Circular 163/19/2021-GST as mandatory, the Supreme Court has said it is only an option for the taxpayer.
  • Raise limitation first. Section 74 notices for this period on the 70:30 issue fail on the extended period itself.
  • Use the works-contract reasoning carefully. The movability test for plant fixed to a foundation for stability is useful beyond solar, but it turns on the facts of each installation.
  • Writ remedy is not closed. Where the issue is legal and arguable, a High Court should not mechanically relegate the taxpayer to appeal.

Our view

The Supreme Court has approved the view consistently taken by the Andhra Pradesh High Court and settled the pre-2019 position for solar EPC contracts across the country. The judgment is equally important for two wider points: a circular that gives an option cannot be enforced as a mandate, and the extended period cannot be invoked for not following a rule that came into force later.

Source: Sterling and Wilson Pvt Ltd, Supreme Court, Civil Appeal arising out of SLP (C) No. 23844 of 2025, 2026 INSC 1222 (Reportable), decided 16.11.2026 (Sanjay Kumar and Sanjeev Sachdeva, JJ.).

QR code to join the Sashthi Tax Updates WhatsApp group
Sashthi Tax Updates on WhatsApp Scan to become a member — free. Get GST updates, circulars and case law alerts as they happen. chat.whatsapp.com/G7xFSIvZADlKXa1HJRln5m
Sashthi Taxlegal Advisory Services LLP
Hosur • Bengaluru
+91 99521 84110 · contact@sashthitaxlegal.com · sashthitaxlegal.com